A vanity order breaks into separate parts: doors, applied drawer fronts, drawer boxes, hardware, and a finish plan that has to hold up next to a sink. Each part gets its own order line and dimensions, checked against the cabinet, the fixtures, and the plumbing. Specify each one in turn and you end with a component schedule you can check before the order goes out.
Start with the cabinet as it will actually be built, or as it stands in the room. Record whether it's face frame or frameless, the size of every opening, where the walls and fillers land, and which bay holds the sink. Then mark each opening by what goes in it: a working door, a drawer box with an applied drawer front, or a fixed decorative front that covers the sink bowl.
Three sets of numbers show up on a vanity job, and they shouldn't share a column. Room dimensions show what fits in the bathroom, and opening dimensions come off the cabinet. Order dimensions are the actual size of each door, front, and box, and those are the only numbers that belong on an order line.
While you're at the cabinet, note the sink model, where the drain and supply lines enter, and whether the shutoff valves sit inside the cabinet. The drawer boxes in the sink bay get sized around them.
If the job is new doors on an existing vanity, the measuring, removal, and installation steps live in our guide to planning a cabinet door replacement.
Door and front sizes come from four decisions you make at the cabinet: face frame or frameless, overlay or inset, the overlay distance or inset gap you've chosen, and the reveals between neighboring parts. A component supplier builds each door and drawer front to the dimensions you submit, so the arithmetic happens on your side, starting from the overlay your layout calls for.
For an overlay door, the order size is the opening plus twice the overlay in each direction. Take a sample 15 by 27 inch opening with a 1/2 inch overlay: the door is 16 by 28 inches. For two doors over one opening, add both overlays to the opening width, subtract the center reveal you've chosen, then split the result. Inset doors go the other way: subtract twice the gap you want, one for each side, from the opening width and height. Whatever the layout, write the overlay, the inset gap, and the reveals on the schedule so the hinge selection and the door sizes come from the same numbers.
Applied drawer fronts get their own lines and are sized like doors, independently of the drawer box behind them. They also don’t require hinge boring. Short fronts need an additional profile check: frame-and-panel fronts must have enough height and width to accommodate their rails and stiles. If a front falls below the minimum dimensions for its construction and center panel, the frame members may be narrowed or the front changed to a slab. When you order with us, any such change appears on the quote or order acknowledgement. Review the configuration of every short front, including a fixed decorative front under the sink, before approving the order.
Then walk each door through its swing on paper. A door at the end of the run can hit a wall or a piece of trim before it reaches full opening.
Pick the substrate and the finish together, since paint needs a smooth, stable surface and stain shows whatever grain is underneath. Settle who does the finishing at the same time: doors and drawer fronts from us arrive unfinished by default, or primed with a single or double coat, and the final paint or stain is yours.
|
Project brief |
Construction and material to verify |
Coating responsibility |
Bathroom exposure check |
|
Painted MDF door or front |
1-piece MDF, 2-piece MDF, or a slab; confirm the style is offered in that construction |
Shop or finisher primes (unless ordered primed) and applies the color coats to every face and edge |
Unsealed MDF edges can swell if they take on water, so every cut edge gets sealed |
|
Painted hardwood frame with a selected center panel |
5-piece; paint-grade maple frame with an MDF center panel is our default for painted doors |
Shop or finisher primes (unless ordered primed) and paints all sides equally |
The frame is solid wood and moves with humidity; a stable panel limits paint cracking at the joints |
|
Stain-grade wood door or front |
5-piece in stain-grade maple, white oak, or a species on request; veneer or solid center panel to suit the look |
Shop or finisher stains and topcoats all sides, including backs and edges |
Solid wood expands and contracts with moisture, so it needs stable room conditions and sealing on every face |
Moisture-resistant board still needs protection from water. One panel maker's moisture-resistant MDF guidance rates its MR board for humid interiors such as bathrooms, yet says the panel should avoid wetting and be fully sealed and coated. Our MDF is a moisture-resistant, double-refined board, and the same rule applies: record the actual substrate and the coating system on the schedule, then follow that system's preparation and application directions.
On the schedule, "primed" and "finished" are separate entries. Drawer boxes get their own entry too: ours ship with two coats of clear pre-catalyzed lacquer by default, with unfinished available on request, so record a box's finish apart from the front that covers it.
A U-shaped drawer is always custom and always needs a drawing, so confirm the plumbing before you order. Measure where the drain, trap and supply lines sit in the opening, from the cabinet sides and from the front; we want at least 2" between any pipe and the drawer sides. Measure how far the sink bowl drops below the counter, which decides whether the top opening gets a working drawer or a false front. Then size the box as usual: the opening less the slide deduction for width, at least 13/16" off the height, the depth matched to the slide. Check that the drawing and the written order agree, especially on depth; if they differ, we confirm with you before cutting, which is a day you can save. For the doors and fronts, write the cabinet type and overlay on the order, for example face frame with a 1-1/4" full overlay. That one line sets the door size, the front size and the hinge boring together. Mark any false front, so we build it without boring and without a box.
Three things come back to shops most often. Shallow fronts: every framing bead has a minimum height, and below it the rails step down or the front becomes a slab; a 5-piece flat-panel front with 2-1/4" rails needs 5", and at 4" it is a slab. Decide which you want, because the acknowledgement will show what we did. Hinge boring: only doors get it, never fronts, and nothing under 9" tall. We bore to the overlay you give us, so measure it rather than estimate: close an existing door, tape the face frame along its edge, open it, and measure from the tape to the opening. Finish: doors and fronts arrive unfinished unless you order primer, drawer boxes arrive lacquered unless you ask for unfinished. A bathroom is a wet room, so seal every surface before install; unsealed wood and excessively humid conditions are outside the warranty, and for a painted vanity, MDF moves least.
In the sink bay, start from the verified opening and the actual fixture envelope: the underside of the bowl, the drain and trap, the supply lines and shutoffs, and where each of them sits relative to the cabinet sides and back. With those positions on paper, decide which option fits: ordinary drawers in the bays beside the sink, a shorter box that runs under the bowl, or a custom-shaped box that wraps the plumbing.
A U-shaped box is the custom option, notched to follow the pipes, so each one needs a drawing that shows the cutout dimensions and where they fall on the box. For example, our custom drawer around the plumbing requires that drawing with the order, and we recommend at least 2 inches between the piping and the drawer sides. Your fixture, the trap configuration, and the access a plumber needs can call for more.
Check the box through its full travel, closed to fully extended, and confirm the valves and trap stay reachable with the drawer in place. Then keep three dimensions distinct on the schedule: the usable storage inside the box, the outside box size you'll order, and the applied front that covers it.
Hardware is the last compatibility check before release, and it needs exact model numbers. For doors, record the hinge, the mounting plate if one applies, and the boring pattern that hinge needs. When you order with us, you tell us the cabinet type and overlay style, we recommend the boring and a matching hinge kit as an add-on to the door order, and if you're supplying your own hinges you select the boring that matches them.
For drawers, record the slide model, its length, and the box construction it expects. The deduction from opening width to box width depends on the slide type, so be careful to distinguish between undermount and sidemount slides when calculating box size. Door hinges that protrude into an opening take usable width from any drawer or pull-out behind that door, so deduct the protrusion from the opening in addition to the slide deduction.
Run four checks against the final layout and the manufacturer's data: hinge projection into the opening, drawer travel past the neighboring fronts, pull or handle interference at a wall, and the clearance the slide needs behind and above the box.
The schedule is where the vanity turns into order lines: one for every door, applied front, drawer box, and custom box, plus the hardware references each line depends on. Keep it as one shop document so whoever releases the order sees every input beside the dimension it produced.
Fields worth a column on each line:
Our order review has three team members read every order, and we contact you when an entry looks nonstandard. Checking fit against your cabinet, fixtures, and hardware stays with your shop.
Once every line has a component type, an order size, a finish owner, and a checker's sign-off, the schedule is ready to quote, and the quote gets checked against it before you approve. When yours gets there, send it to Eagle Woodworking for cabinet doors and drawer fronts built to your dimensions.
Submit the actual size of each door and drawer front. Work it out from the cabinet construction, the overlay or inset you've chosen, the reveals to neighboring parts, and anything the door has to clear at full swing. When you order with us, enter inches to the nearest 1/16 inch.
It depends on the front's height and width. A frame-and-panel front needs room for its rails and stiles, and below the minimums for its construction and center panel, the frame members get narrower or the front becomes a slab. Review the quoted configuration for each short front before you approve it.
Yes, as long as the sink, piping, and drawer travel are measured and the layout leaves room. A custom-shaped box can notch around the trap and supply lines. We build ours from a drawing you supply with the order, and the notch dimensions follow your plumbing layout. Keep the shutoffs and trap reachable with the drawer installed.
No. The applied drawer front is a separate product from the box it covers. In our ordering system, fronts belong to the door and drawer-front product line and go on the doors order form with the line type set to drawer front. The drawer box is ordered on its own form, so each needs its own line on your schedule.
Record the substrate, the finish state as supplied, and who applies the final color or clear finish, with each drawer box's finish on a separate line from its front. Our doors and drawer fronts arrive unfinished by default or primed with one or two coats, and our drawer boxes arrive with two coats of clear pre-catalyzed lacquer unless you request them unfinished.